Work across four divisions.

Selected projects

Project experience in detail.

01

RPC Ventilation, Heating and Cooling Upgrades

Fredericton, NB


New Brunswick Research and Productivity Council


August 2025


Renovation of mechanical systems in two core buildings, with associated electrical, architectural and structural upgrades planned around future expansion and occupied operations.


Laboratory and fume hood controls


Supply-air integration and differential pressure sensors


Three rooftop laboratory exhaust fans across two buildings


Heat-recovery chillers, pumps and steam heat exchangers


Relocation of penthouse heat exchanger


Concrete equipment curbs


Power for fan coils, major equipment and laboratory controls


02

Sunrise Wellfield Development – Water Treatment and Control Systems

New Maryland, NB


Village of New Maryland


June 2026


Water treatment process control building and booster pump/PRV station, including foundations, structures, electrical, plumbing and mechanical systems.


Packaged water-treatment system


Process piping, backwash and high-lift pumps


Booster package and chemical dosing


Filtration, disinfection and control equipment


Testing, commissioning and operator training and manuals


03

Benjamins Mill Wind Project Phase 1

West Hants Regional Municipality, Hants County


Natural Forces & Wskijnu’k Mtmo’taqnuow Agency Ltd.


2023–2025


Eight turbines delivering approximately 34 MW; near-surface granite required adaptive planning and construction.


Collector system construction


Substation civil and electrical works


Commissioning


04

Sobeys Oromocto Warehouse Expansion

Oromocto, NB


Crombie Limited Partnership


October 2025


Seven-acre paved parking area, storm drainage, site lighting, gravel pad for future warehouse expansion and waterway diversion. The baseline schedule was met with no lost-time injuries.


43,000 cubic metres of soil


28,000 tons of crushed rock


6,700 tons of asphalt


800 metres of storm piping