Projects
Work across four divisions.
A selection of work delivered across K-Line’s Building, Power, Civil and Telecom divisions.

Selected projects
Project experience in detail.

Building
01
RPC Ventilation, Heating and Cooling Upgrades
Location
Fredericton, NB
Client
New Brunswick Research and Productivity Council
Year
August 2025
Renovation of mechanical systems in two core buildings, with associated electrical, architectural and structural upgrades planned around future expansion and occupied operations.
Scope
Laboratory and fume hood controls
Supply-air integration and differential pressure sensors
Three rooftop laboratory exhaust fans across two buildings
Heat-recovery chillers, pumps and steam heat exchangers
Relocation of penthouse heat exchanger
Concrete equipment curbs
Power for fan coils, major equipment and laboratory controls


Building
02
Sunrise Wellfield Development – Water Treatment and Control Systems
Location
New Maryland, NB
Client
Village of New Maryland
Year
June 2026
Water treatment process control building and booster pump/PRV station, including foundations, structures, electrical, plumbing and mechanical systems.
Scope
Packaged water-treatment system
Process piping, backwash and high-lift pumps
Booster package and chemical dosing
Filtration, disinfection and control equipment
Testing, commissioning and operator training and manuals


Building
03
Benjamins Mill Wind Project Phase 1
Location
West Hants Regional Municipality, Hants County
Client
Natural Forces & Wskijnu’k Mtmo’taqnuow Agency Ltd.
Year
2023–2025
Eight turbines delivering approximately 34 MW; near-surface granite required adaptive planning and construction.
Scope
Collector system construction
Substation civil and electrical works
Commissioning




Building
04
Sobeys Oromocto Warehouse Expansion
Location
Oromocto, NB
Client
Crombie Limited Partnership
Year
October 2025
Seven-acre paved parking area, storm drainage, site lighting, gravel pad for future warehouse expansion and waterway diversion. The baseline schedule was met with no lost-time injuries.
Scope
43,000 cubic metres of soil
28,000 tons of crushed rock
6,700 tons of asphalt
800 metres of storm piping